Courtesy of Keller Williams Preferred Realty, Rashid Izzat Abdallah.
Great value add opportunity in an amazing location. This property is conveniently within walking distance to Barton College and downtown Wilson. Roof replaced in 2022. There is a apartment building nearby that is scheduled to open in fall 2024. Property can be accessed from Gray street. Be careful on the property. There is no paved driveway or gravel. Building is unlivable with no/zero heated square footage and no utilities on. There are asbestos covered pipes present in the building.
Select the items on the page that you would like to print. This "Print Options" block will not be printed.
Main Photo | Main Details | Property Description | Property Features |
Additional Photos | Addtl Photos Size | Location Map | Schools |